Power for AI.
Flexibility for the Grid.

Emerald AI makes AI’s power demand flexible, transforming data centers into valuable grid partners, protecting energy affordability and reliability for local communities, and unlocking massive capacity on existing grid infrastructure to power the AI revolution today.

Featured Updates

Emerald AI Raises $150M Series A at $1.05B Valuation

Emerald AI Raises $150M Series A at $1.05B Valuation

Emerald AI is tackling AI's power crunch by transforming AI data centers into flexible grid assets that dynamically adjust power consumption in response to power grid conditions, an approach that can unlock up to 100 gigawatts of capacity on the existing U.S. grid for AI while protecting grid reliability and energy affordability for communities

August 25, 2026
Read More
Emerald AI Is Selected as a 2026 Technology Pioneer by the World Economic Forum

Emerald AI Is Selected as a 2026 Technology Pioneer by the World Economic Forum

Emerald AI is among a global cohort of companies tackling the world's most pressing challenges. For us, it's a clear signal that power flexibility, not simply more power, is becoming central to scaling AI innovation all while building a reliable grid.

June 10, 2026
Read More
Silicon Valley Power and Emerald AI Launch Pilot to Demonstrate Flexible Data Centers in Santa Clara and Unlock Power Capacity for AI

Silicon Valley Power and Emerald AI Launch Pilot to Demonstrate Flexible Data Centers in Santa Clara and Unlock Power Capacity for AI

Silicon Valley Power and Emerald AI today announced a pilot program to demonstrate how flexible data centers can help support grid reliability, affordability, and more efficient system planning as advanced digital infrastructure continues to grow in Silicon Valley.

April 21, 2026
Read More
WSJ: Nvidia, Emerald AI Partner With Power Companies on New AI Factories

WSJ: Nvidia, Emerald AI Partner With Power Companies on New AI Factories

Participating power companies include AES, Constellation, Invenergy, NextEra Energy, Nscale Energy & Power, and Vistra

March 23, 2026
Read More
The New York Times
The New York Times
The New York Times
TED
TED
TED
Bloomberg
Bloomberg
Bloomberg
The Wall Street Journal
The Wall Street Journal
The Wall Street Journal
Fortune
Fortune
Fortune
Axios
Axios
Axios
The Times
The Times
The Times
Newsweek
Newsweek
Newsweek
TIME
TIME
TIME

1

2

3

AI’s explosive growth is colliding with grid limits, delaying AI infrastructure by years and raising energy costs for everyone.

Intelligent flexibility unlocks 100GW of capacity for AI data centers — speeding innovation, lowering rates, and avoiding blackouts.

Emerald AI enables data centers to provide relief when the grid is stressed while assuring critical AI performance.

/ 3

We Work with
World Class Partners

Emerald AI's customers span the largest AI firms, global data center operators, and leading power utilities, and we partner with companies across the AI and energy value chain defining the intelligence era.

Jensen Huang

“AI factories are the engines of the intelligence era, and like any great engine, every system must be designed together — energy, compute, networking and cooling as one architecture. NVIDIA and Emerald AI are working together to enable a future for AI where performance, efficiency and grid responsiveness can be tapped into immediately.”

Jensen Huang

Founder and CEO, NVIDIA

John Ketchum

“NextEra looks forward to working with NVIDIA and Emerald AI to help design efficient energy campuses and flexible AI factories that economically support rising demand while further strengthening America’s energy infrastructure.”

John Ketchum

Chairman, President and CEO, NextEra Energy

Pradeep Vincent

“Compute infrastructure that is responsive to real-time grid conditions while meeting the performance demands unlocks a new model for scaling AI.”

Pradeep Vincent

Chief Technical Architect and Senior Vice President, Oracle Cloud Infrastructure

Steve Smith

“Emerald AI demonstrates how innovative technologies can help us optimise the grid, enable increased investment in advanced computing, and deliver real benefits to the wider UK economy.”

Steve Smith

Chief Strategy and Regulation Officer, National Grid UK

Chris Sharp

“Emerald AI’s innovative solutions provide a valuable opportunity to explore how flexible power management can support both our customers’ growth and the broader energy ecosystem.”

Chris Sharp

Chief Technology Officer, Digital Realty

InfraPartners
Siemens
Dominion
Nebius
Nextera
Invenergy
Constellation
AES
Samsung
IQT
GE Vernova
Eaton
IBM
National Grid
EPRI
Nextgrid
PJM
Digital Realty
SRP
Oracle
Nvidia

What if the biggest new user of electricity–AI–could become the grid’s greatest ally?

AI flexibility can unlock 100GW to power the AI revolution today

Temporal AI flexibility

Briefly slow or pause batchable AI workloads when the grid is stressed and resume post‑event, all within SLA guardrails.

Spatial AI flexibility

Shift workloads across regions on fiber to where power is abundant — within latency bounds.

Resource flexibility

Dispatch batteries and other onsite energy alongside compute orchestration for maximum, reliable flexibility.

What if the biggest new user of electricity–AI–could become the grid’s greatest ally?

AI Flexibility Can Unlock 100GW to Power the AI Revolution Today

Temporal AI flexibility

Briefly slow or pause batchable AI workloads when the grid is stressed and resume post‑event, all within SLA guardrails.

Spatial AI flexibility

Shift workloads across regions on fiber to where power is abundant — within latency bounds.

Resource flexibility

Dispatch batteries and other onsite energy alongside compute orchestration for maximum, reliable flexibility.

The Infrastructure Behind the Infrastructure

Emerald Conductor is the flexibility management platform for AI infrastructure. We connect utilities and data centers in real time, simulate a digital twin model of AI power, orchestrate compute alongside onsite energy, and verify performance—so AI can grow in harmony with stronger, more affordable grids.

Connect grids & data centers

Provide operators with AI demand visibility and enable data centers to respond to grid signals.

Orchestrate AI workloads & onsite energy

Flexibly control power use, meeting grid needs while preserving AI performance.

Optimize across data center fleets

Orchestrate spatiotemporal workload flexibility to support grids nationwide.

Verify performance

Auditable M&V data and automated reporting, establishing data centers as credible grid resources.

Academic Rigor at Commercial Scale

Emerald AI has deployed power flexibility at commercial data centers around the world, validating the results with partners, customers, and top scientific journals.

Arizona · 2025

First peer-reviewed proof of AI power flexibility

During peak grid demand on a hot Phoenix afternoon, Emerald Conductor flexes down AI power demand at an Oracle data center by 25% over three hours to meet utility needs.

Platform: NVIDIA A100 · Partners: EPRI, Oracle, NVIDIA, SRP, Databricks

United Kingdom · 2025

Beating the tea-kettle surge

When football halftime hits, a gigawatt of tea kettles switches on. Emerald Conductor shaved power to ease national grid kettle spikes and met 200 power targets overall with 100% compliance.

Platform: NVIDIA B300 · Partners: EPRI, Nebius, NVIDIA, National Grid

Virginia ↔ Chicago · 2026

Shifting load across the map

During Virginia's winter peak, Emerald geo-shifted inference traffic within milliseconds from a constrained Virginia cluster to a Chicago cluster with available capacity — ensuring inference was served within latency constraints.

Platform: NVIDIA H100 · Partners: EPRI, Oracle, NVIDIA, Commonwealth Edison, PJM

Oregon · 2026

Full-stack economic dispatch under extreme weather

Deploying on NVIDIA Grace Blackwell Ultra clusters, Emerald Conductor shaved power against volatile market pricing signals and sustained multi-day load reductions through heat dome and freezing rain stress events.

Platform: NVIDIA GB300 · Partners: EPRI, Portland General Electric, NVIDIA

California · 2026

Counteracting the California Duck Curve

Emerald's first multi-MW, full data center deployment cut power use during peak California CAISO demand on a hot summer day, reducing load after sunset when solar generation goes dark.

Platform: NVIDIA H100

Virginia · 2026

The World's First Power-Flexible AI Data Center

Emerald AI partners with NVIDIA and Digital Realty to launch a 96MW Vera Rubin AI Factory in Manassas, Virginia, that sets a new reference architecture for power-flexible AI infrastructure built on the NVIDIA DSX Platform.

Platform: NVIDIA Vera Rubin · Partners: NVIDIA, Digital Realty, EPRI, PJM, Dominion

Connecting the Ecosystem That's Powering the AI Revolution

01

For data center developers & operators

Get to 'Power-On' in Months, Not Years. Accelerate your interconnection queue, upsize an existing connection, and turn your energy consumption into a monetizable asset. We make your facility a preferred partner for any utility.

02

For utilities & operators

Integrate the Future, Safely. Transform the largest new source of demand into your most valuable flexible resource. Gain unprecedented visibility, accurate forecasting, and dispatchable load to enhance grid stability and defer costly infrastructure upgrades.

03

For AI innovators & cloud providers

Scale Without Constraint. Never let power availability dictate the pace of your innovation. Our platform ensures you have swift access to the energy you need to train and deploy the world's most advanced models, while assuring stringent AI performance standards.

04

For regulators & policymakers

Enable Innovation, Ensure Reliability, Protect Affordability. Accelerate the AI economic boom while strengthening grid resilience and protecting ratepayers. Our platform provides a powerful, market-based tool to manage new demand efficiently, achieving policy goals without relying solely on costly and slow-to-build infrastructure.

Dive Deeper

Publication

A UK first trial of AI flexibility

Emerald AI, EPRI, National Grid, Nebius, and NVIDIA recently conducted a live, UK-first demonstration at Nebius’ new AI Factory in London. Demonstrating that high-performance AI infrastructure could operate as a power-flexible, grid-responsive asset without disrupting mission-critical workloads.

Presentation

Behind Flexible Computing

Discover how AI data centers can become virtual power plants that stabilize the grid and accelerate clean energy. Emerald AI's Ayse Coskun explains how.

Presentation

Powering the AI Revolution

Emerald AI CEO Dr. Varun Sivaram shares how we can have it all: breakneck AI innovation, massive AI investment, and abundant, reliable, and affordable energy.

Publication

Nature Energy: AI Flexibility in Phoenix

Our Arizona demonstration results were peer-reviewed and accepted in one of the world's top scientific journals, demonstrating the pioneering advances of Emerald's Conductor platform to make AI data centers flexible, reliable partners to the grid.